How do you see WIP by work order without exporting from your ERP?

The short answer

Connect read-only to the systems that already record the work, agree once on what each quantity means, and show ordered, recorded, completed and shipped quantities together for each work order. The view stays current from the source, so nobody exports and regroups a spreadsheet to find out where a job stands.

Why WIP turns into a spreadsheet

The ERP holds the order. The floor records labor and quantities against the work order. Shipping records what left the building. Each screen answers part of the question, and the standard reports answer the questions someone thought to ask when they were set up.

So someone exports, regroups the data in a spreadsheet, and circulates it. By the time it is read, it is already out of date, and a question about any figure means repeating the work.

What it takes

  • A read-only connection to the systems that record the work: the ERP, the shop floor records, and shipping.
  • One agreed definition for each quantity, such as what counts as recorded, completed, or shipped. Your team agrees it with us once, and every view uses it.
  • One view per work order with those quantities side by side, instead of four screens.
  • A drill-down from any total to the records behind it, with exceptions flagged for review.

A note on value: this is about where work stands. WIP value in dollars depends on your costing method, so your accounting team defines it with us before it is shown.

What changes

In our production scheduler case study, ordered, tracked, completed and shipped quantities used to live in separate places. The schedule now shows them together for each job it covers, and the scheduler decides what to run next and what to chase from the recorded numbers.

In the plant controller case study, the weekly export-and-regroup step is gone, and a question about a figure is answered by drilling into it. That is what analytics should do: put the answer where the decision is made.

Related questions

Do we have to change our ERP?

No. Your ERP stays the system of record. The first connection only reads, and any updates back to your systems come later, separately agreed and under controls you approve.

Does this replace our ERP WIP reports?

It does not have to. Your ERP and its reports stay in place. The view adds a current picture between them, built on definitions your team agreed.

What if our floor data is incomplete?

We start by confirming read access and checking the data. If your data cannot support the answer you need, we tell you before you commit.

More answers · All case studies

Start with one decision.

Tell us the question you cannot answer today. We will tell you honestly whether your data can support an answer.